STARFLEET ARCHIVAL SERVICES
SYSTEM ONLINELCARS 47.02
Archive index
USS Firebird / Mission file

Interlude 4

Active mission

A period of time that contains both shore leave and routine missions. This "interlude" covers the following dates: February 15th 2395- May 15th, 2395. February 15th- February 28th : Shore leave at Empok Nor and personnel changes. March 1st, 2395- May 15th 2395 : Standard missions without distinctions. We spend time from March 1st- March 12th assisting with an outbreak of Huerin Pox on Bajor. During this time we shuttle back and forth to DS9 and spend time on Bajor as a mobile hospital. March 13- March 20 we are back on Empok Nor March 21-23 We are en route to assist the USS Faringham, an Intrepid class ship experiencing power failure March 23-25 Assisting USS Faringham March 26- March 30 en route to Earth March 30- April 7 Shore leave on Earth and training April 8 - April 16 En Route to Vulcan, transporting ambassador Julie Hertl to summit. April 17- April 19 En Route to Proxima 5 April 20- April 23 Production of heavy equipment to assist rebuilding of infrastructure loss due to natural disaster April 23-25 En Route to Empok Nor April 26-29 Shore Leave Empok Nor April 30- May 2 Tactical recertification with USS Scimitar May 3-May 7 En Route to Alpha Centauri May 8 Crew Attends wedding of Petty Officer 1st Class Kipp Lak May 9- May 10 Shore Leave on Alpha Centauri May 11- May 13 En Route to Empok Nor May 14- May 15 Routine Maintenance at Empok Nor
Analyze with computer